Simulation using ProModel. / Charles Harrell, Biman K. Ghosh, Royce Bowden.

By: Harrell, Charles, 1950-Contributor(s): Ghosh, Biman K | Bowden, RoyceMaterial type: TextTextPublisher: Boston : McGraw-Hill/Higher Education, c2004Edition: 2nd edDescription: xviii, 733 p. : ill. ; 25 cm. +ISBN: 0072919809 (alk. paper); 007248263XSubject(s): ProModel | Computer simulationDDC classification: 003/.35369 LOC classification: QA76.9.C65 H355Online resources: Table of contents
Contents:
Study Chapters -- Introduction to Simulation -- System Dynamics -- Simulation Basics -- Discrete-Event Simulation -- Getting Started -- Data Collection and Analysis -- Model Building -- Model Verification and Validation -- Simulation Output Analysis -- Comparing Systems -- Simulation Optimization -- Modeling Manufacturing Systems -- Modeling Material Handling Systems -- Modeling Service Systems -- Labs -- Introduction to ProModel 6.0 -- ProModel World View, Menu, and Tutorial -- Running a ProModel Simulation -- Building Your First Model -- ProModel's Output Module -- Fitting Statistical Distributions to Input Data -- Basic Modeling Concepts -- Model Verification and Validation -- Simulation Output Analysis -- Comparing Alternative Systems -- Simulation Optimization with SimRunner -- Intermediate Modeling Concepts -- Material Handling Concepts -- Additional Modeling Concepts -- Case Study Assignments -- Toy Airplane Manufacturing -- Mi Cazuela - Mexican Restaurant -- Jai Hind Cycles Inc. Plans New Production Facility -- The FSB Coin System -- Automated Warehousing at Athletic Shoe Company -- Concentrate Line at Florida Citrus Company -- Balancing the Production Line at Southern California Door Company -- Material Handling at California Steel Industries, Inc -- Common Continuous and Discrete Distributions -- Critical Values for Student's t Distribution and Standard Normal Distribution -- F Distribution for [alpha] = 0.05 -- Critical Values for Chi-Square Distribution.
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Home library Call number Copy number Status Date due Barcode
Books Books WISCONSIN INTERNATIONAL UNIVERSITY COLLEGE, GHANA - MAIN LIBRARY
General Stacks
WISCONSIN INTERNATIONAL UNIVERSITY COLLEGE, GHANA - MAIN LIBRARY
QA76.9.C65 H355 (Browse shelf) 1 Available 5374/12
Books Books WISCONSIN INTERNATIONAL UNIVERSITY COLLEGE, GHANA - MAIN LIBRARY
General Stacks
WISCONSIN INTERNATIONAL UNIVERSITY COLLEGE, GHANA - MAIN LIBRARY
QA76.9.C65 H3551 (Browse shelf) 2 Available 5375/12
Books Books WISCONSIN INTERNATIONAL UNIVERSITY COLLEGE, GHANA - MAIN LIBRARY
General Stacks
WISCONSIN INTERNATIONAL UNIVERSITY COLLEGE, GHANA - MAIN LIBRARY
QA76.9.C65 H3552 (Browse shelf) 3 Available 5376/12

Includes bibliographical references and index.

Pt. I. Study Chapters -- 1. Introduction to Simulation -- 2. System Dynamics -- 3. Simulation Basics -- 4. Discrete-Event Simulation -- 5. Getting Started -- 6. Data Collection and Analysis -- 7. Model Building -- 8. Model Verification and Validation -- 9. Simulation Output Analysis -- 10. Comparing Systems -- 11. Simulation Optimization -- 12. Modeling Manufacturing Systems -- 13. Modeling Material Handling Systems -- 14. Modeling Service Systems -- Pt. II. Labs -- 1. Introduction to ProModel 6.0 -- 2. ProModel World View, Menu, and Tutorial -- 3. Running a ProModel Simulation -- 4. Building Your First Model -- 5. ProModel's Output Module -- 6. Fitting Statistical Distributions to Input Data -- 7. Basic Modeling Concepts -- 8. Model Verification and Validation -- 9. Simulation Output Analysis -- 10. Comparing Alternative Systems -- 11. Simulation Optimization with SimRunner -- 12. Intermediate Modeling Concepts -- 13. Material Handling Concepts -- 14. Additional Modeling Concepts -- Pt. III. Case Study Assignments -- Case 1. Toy Airplane Manufacturing -- Case 2. Mi Cazuela - Mexican Restaurant -- Case 3. Jai Hind Cycles Inc. Plans New Production Facility -- Case 4. The FSB Coin System -- Case 5. Automated Warehousing at Athletic Shoe Company -- Case 6. Concentrate Line at Florida Citrus Company -- Case 7. Balancing the Production Line at Southern California Door Company -- Case 8. Material Handling at California Steel Industries, Inc -- App. A. Common Continuous and Discrete Distributions -- App. B. Critical Values for Student's t Distribution and Standard Normal Distribution -- App. C. F Distribution for [alpha] = 0.05 -- App. D. Critical Values for Chi-Square Distribution.

System requirements: Windows 98, ME, NT 4.0, 2000, or XP.

There are no comments on this title.

to post a comment.

If you have any concerns or questions; kindly contact the library


© Powered by WIUC IT - Support Services Unit